new trench to the barn for water and new electrics. 180 feet line. 42inches deep here is code for water for frost. Figured I'd run the electrics underground and take down this arial line that keeps getting major ice loads on it and has broken twice. As you can see in the pictures finished it at dusk. Will put in the water lines and electrics tomorrow and back fill it before it freezes. It was 23 this am and dropping for next 4 days down 19 by Monday with day highs in the low 30's so no time to spare. Got to put in a below ground hydrant for the water inside the barn. Gto get a load of pea stone tomorrow so it will have a place to drain to for the frost free part. Had one today but it was from China so took it back to Tractor Supply. Found a USA one from Georgia at a Plumbing shop... Hadn't planned on this job or it would of been done but wife wanted it if I could do it. Today was the window of opportunity. Grabbed a few pictures for show and tell...
Place looks like a bomb hit but at least its done.
George-CT
Place looks like a bomb hit but at least its done.
George-CT